Preparation work for Cadzand-Bad Maritime is underway

The loading dike, a temporary road in the seas for transport of materials is under construction. The material for the construction will be brought to site by ship and ashore via this loading dike. The construction of the ‘Dune Boulevard’ is also under construction, the new dune paths will be built from Hotel De Blanke Top to the beach pavilion De strandloper.